Electricity and water applications for a building project. Understand the difference between design approval, connections and the other builder services available from DEWA.

Visit the official website

Utilities planned with the building

DEWA’s builder services cover the technical applications needed for electricity and water infrastructure and connections.

  • Electricity permits and connections

    DEWA combines the electricity building NOC and connection request in one application for enrolled consultants and contractors.

  • Fit-out and network work

    Fit-out connections, network modifications and solar applications have their own service routes.

  • Water and infrastructure

    The directory also includes water building NOCs, water connections and infrastructure-project NOCs.

Before you apply

Use the official service for the exact scope. The sequence and documents depend on the application.

  1. Choose the builder service

    Identify whether the work concerns a new connection, fit-out, network change or another listed service.

  2. Confirm the appointed applicant

    DEWA maintains a directory of enrolled consultants and contractors, filterable by service and category.

  3. Coordinate loads and layouts

    The electricity connection service requires project drawings and electrical information relevant to the installation.

  4. Plan site readiness and inspection

    For electricity connections, the service includes payment as applicable and inspection stages before supply release.

A brief history

  1. 1959

    The original utilities

    Dubai Electricity Company and Dubai Water Department were established as separate organisations.

  2. 1992

    One authority

    DEWA was formed on 1 January 1992 through the merger of those two organisations.

  3. 2022

    A listed utility

    DEWA was listed on the Dubai Financial Market in April 2022.

Common questions

Who submits a technical electricity connection application?

DEWA’s electricity permits and connections service is for enrolled consultants and contractors. Its official directory lets you check the service category of an enrolled firm.

Is a DEWA account activation the same as technical approval?

No. DEWA separates consumer services from builder services. A building or altered installation may need a technical service route in addition to the customer’s account arrangements.

Can an existing property need a new technical application?

DEWA lists fit-out connections and network modifications separately, and its electricity service guidance also addresses additional loads. Review the proposed installation and select the applicable service.

Does a design approval mean the supply is ready?

The electricity service includes site inspection and supply-release steps. Coordinate the approved design, installation readiness and required inspections rather than assuming approval alone completes the connection.

Official sources

Sources checked 2026-10-17. Confirm current service requirements before applying.

Need help with your project?

Tell us the location and work you’re planning. We’ll help you understand the next steps.